Stormwater runoff from approximately 30 acres of predominately impervious area including driveways, streets, buildings, and other impervious areas collects in catch basins and pipes and flows to the Heather Downs Detention Pond, where it currently provides no treatment runoff. The pond runoff discharges to Maplewood Creek, a tributary to the Cedar River, and ultimately to Lake Washington.
The project will retrofit a city-owned detention facility in the Heather Downs residential development to be a combined detention and water quality treatment facility. This stormwater facility will provide flow control and additional basic water quality treatment to remove pollutants from streets and other pollution generating surfaces within a 30-acre drainage basin.